Kékéli Efficient Power plant to start operations by the end of 2020

Energy
Friday, 06 December 2019 14:58
Kékéli Efficient Power plant to start operations by the end of 2020

(Togo First) - The Kekeli Efficient Power thermal plan, located in Lomé, should be operational by the end of 2020.

In detail, the first operational phase was launched last June. Upon its completion, expected in Q3 2020, the plant should have a production capacity of 47 MW using a gas turbine. In the second stage (scheduled for Q3 2021), a steam turbine with a capacity of 18MW will be added. This will bring the plant's annual production to around 526GWh, and convert the thermal plant into a combined-cycle plant - to reduce greenhouse gas emissions. 

The energy produced at the plant should be provided to about 1.5 million people (20% of the population). It cost XOF65 billion. 

togofirst mobile

 
Sondage
Should we encourage young togolese toward agriculture?
  • 57 Votes
    Yes
    55.88%
  • 25 Votes
    No
    24.51%
  • 20 Votes
    Don't have opinion
    19.61%
← Back
Total 102 Votes

To contact us: c o n t a c t [@] t o g o f i r s t . c o m

Please publish modules in offcanvas position.