SMEs and SMIs no longer need to pay fees to get connected to medium tension power networks

Public services
Friday, 05 March 2021 16:20
SMEs and SMIs no longer need to pay fees to get connected to medium tension power networks

(Togo First) - In Togo, SMEs and SMIs consuming between 120 and 150kVA of power will not pay to get connected to the public grid. This falls under the government’s efforts to improve the country’s business climate.

In a statement it recently released, the Togolese power utility declared that “the cost for connection to the medium tension network of the public grid has been made free for SMEs and SMIs with a consumption level ranging between 120 and 150kVA.”

The fees concerned, it should be recalled, were previously reduced by 30%, and later by 50%.

Besides SMEs and SMIs, Togolese authorities, as stated under its national electrification strategy, aim to electrify the whole country by 2030.

To contact us: c o n t a c t [@] t o g o f i r s t . c o m

Please publish modules in offcanvas position.